Categories
- Boardroom Tables
- Bookcases
- Clerical Desking
- Coffee Tables
- Dining Tables
- Dressers
- Fireproof Safe Boxes
- Hangers
- High Back Office Chairs
- Home Chairs
- Home Decor
- Home office furniture
- Kids Furniture
- Locker Cabinets
- Mid Back Office Chairs
- Office Benches
- Office Cabinets
- Office Furniture
- Office Sofa Sets
- Office Tables
- Office Workstations
Products
-
2-Door Metallic Office Safe Cabinet
KSh33,500.00Original price was: KSh33,500.00.KSh28,500.00Current price is: KSh28,500.00. -
Office Executive Ergonomic Chair
KSh28,500.00Original price was: KSh28,500.00.KSh23,500.00Current price is: KSh23,500.00. -
3 Meters Office Boardroom Table
KSh98,500.00Original price was: KSh98,500.00.KSh88,500.00Current price is: KSh88,500.00. -
Ergonomic Office Chair with Flip Armrest
KSh23,500.00Original price was: KSh23,500.00.KSh19,500.00Current price is: KSh19,500.00. -
4-Way Modular Office Workstation
KSh98,500.00Original price was: KSh98,500.00.KSh93,500.00Current price is: KSh93,500.00. -
50Kgs Digital Fireproof Safe Box
KSh43,500.00Original price was: KSh43,500.00.KSh38,500.00Current price is: KSh38,500.00. -
Office Clerical Mesh Study Chair
KSh12,500.00Original price was: KSh12,500.00.KSh6,500.00Current price is: KSh6,500.00. -
Managers L-shaped Executive Table
KSh63,500.00Original price was: KSh63,500.00.KSh58,000.00Current price is: KSh58,000.00. -
Executive Manager Reclining Chair
KSh88,500.00Original price was: KSh88,500.00.KSh78,500.00Current price is: KSh78,500.00. -
2-Door Wooden Filling Cabinet
KSh33,500.00Original price was: KSh33,500.00.KSh28,500.00Current price is: KSh28,500.00. -
3-Link Padded Reception Bench
KSh33,500.00Original price was: KSh33,500.00.KSh28,500.00Current price is: KSh28,500.00. -
Customized Generic Computer Desk
KSh23,500.00Original price was: KSh23,500.00.KSh18,500.00Current price is: KSh18,500.00. -
Executive Ergonomic Office Seat
KSh28,500.00Original price was: KSh28,500.00.KSh26,500.00Current price is: KSh26,500.00. -
2-Door Metallic Document Cabinet
KSh28,500.00Original price was: KSh28,500.00.KSh24,500.00Current price is: KSh24,500.00. -
Office Secretary Headrest Chair
KSh12,500.00Original price was: KSh12,500.00.KSh9,500.00Current price is: KSh9,500.00. -
3 Meters Office Boardroom Table
KSh115,000.00Original price was: KSh115,000.00.KSh98,499.00Current price is: KSh98,499.00. -
Digital 80Kgs Fireproof Safe Box
KSh63,500.00Original price was: KSh63,500.00.KSh58,000.00Current price is: KSh58,000.00. -
High Back Ergonomic Staff Chair
KSh28,500.00Original price was: KSh28,500.00.KSh23,500.00Current price is: KSh23,500.00. -
Directors 1800mm Executive Table
KSh63,500.00Original price was: KSh63,500.00.KSh58,000.00Current price is: KSh58,000.00. -
3-Link Padded Reception Bench
KSh28,500.00Original price was: KSh28,500.00.KSh24,500.00Current price is: KSh24,500.00.
Products
-
2-Door Metallic Office Safe Cabinet
KSh33,500.00Original price was: KSh33,500.00.KSh28,500.00Current price is: KSh28,500.00. -
Office Executive Ergonomic Chair
KSh28,500.00Original price was: KSh28,500.00.KSh23,500.00Current price is: KSh23,500.00. -
3 Meters Office Boardroom Table
KSh98,500.00Original price was: KSh98,500.00.KSh88,500.00Current price is: KSh88,500.00. -
Ergonomic Office Chair with Flip Armrest
KSh23,500.00Original price was: KSh23,500.00.KSh19,500.00Current price is: KSh19,500.00. -
4-Way Modular Office Workstation
KSh98,500.00Original price was: KSh98,500.00.KSh93,500.00Current price is: KSh93,500.00. -
50Kgs Digital Fireproof Safe Box
KSh43,500.00Original price was: KSh43,500.00.KSh38,500.00Current price is: KSh38,500.00. -
Office Clerical Mesh Study Chair
KSh12,500.00Original price was: KSh12,500.00.KSh6,500.00Current price is: KSh6,500.00. -
Managers L-shaped Executive Table
KSh63,500.00Original price was: KSh63,500.00.KSh58,000.00Current price is: KSh58,000.00. -
Executive Manager Reclining Chair
KSh88,500.00Original price was: KSh88,500.00.KSh78,500.00Current price is: KSh78,500.00. -
2-Door Wooden Filling Cabinet
KSh33,500.00Original price was: KSh33,500.00.KSh28,500.00Current price is: KSh28,500.00. -
3-Link Padded Reception Bench
KSh33,500.00Original price was: KSh33,500.00.KSh28,500.00Current price is: KSh28,500.00. -
Customized Generic Computer Desk
KSh23,500.00Original price was: KSh23,500.00.KSh18,500.00Current price is: KSh18,500.00. -
Executive Ergonomic Office Seat
KSh28,500.00Original price was: KSh28,500.00.KSh26,500.00Current price is: KSh26,500.00. -
2-Door Metallic Document Cabinet
KSh28,500.00Original price was: KSh28,500.00.KSh24,500.00Current price is: KSh24,500.00. -
Office Secretary Headrest Chair
KSh12,500.00Original price was: KSh12,500.00.KSh9,500.00Current price is: KSh9,500.00. -
3 Meters Office Boardroom Table
KSh115,000.00Original price was: KSh115,000.00.KSh98,499.00Current price is: KSh98,499.00. -
Digital 80Kgs Fireproof Safe Box
KSh63,500.00Original price was: KSh63,500.00.KSh58,000.00Current price is: KSh58,000.00. -
High Back Ergonomic Staff Chair
KSh28,500.00Original price was: KSh28,500.00.KSh23,500.00Current price is: KSh23,500.00. -
Directors 1800mm Executive Table
KSh63,500.00Original price was: KSh63,500.00.KSh58,000.00Current price is: KSh58,000.00. -
3-Link Padded Reception Bench
KSh28,500.00Original price was: KSh28,500.00.KSh24,500.00Current price is: KSh24,500.00.
High Back Ergonomic Office Chair
KSh23,500.00 Original price was: KSh23,500.00.KSh19,499.00Current price is: KSh19,499.00.
Superior Comfort & All-Day Support
The High Back Ergonomic Office Chair is designed to elevate your seating experience with advanced comfort and posture-focused support — perfect for busy offices, home workstations, and professional settings. Featuring a high backrest, breathable materials, and ergonomic contours, this chair promotes healthy posture, reduces fatigue, and helps you stay comfortable throughout long work or study sessions.
Built with quality materials and a sturdy frame, this chair delivers dependable durability and smooth mobility. Its adjustable features allow you to tailor the fit to your needs, ensuring personalized comfort and productivity — making it an ideal choice for executives, professionals, and remote workers alike.
🪑 Key Features
🧍♂️ High Back Ergonomic Support
Provides full spine and neck support to maintain healthy posture and reduce strain.
💺 Comfortable Contoured Seat
Generous cushioning enhances comfort during extended use.
🔧 Adjustable Height & Tilt
Easily customize seat height and tilt to suit your posture and desk setup.
🌬️ Breathable Back Material
Promotes airflow to keep you cool, even during long hours.
🛞 Smooth Rolling Casters
Effortless movement across office floors for flexibility and convenience.
🛡️ Durable & Sturdy Construction
Robust frame ensures long-lasting performance in daily use.
✨ Perfect For: Corporate offices, home offices, study areas, and executive workspaces.
Superior Comfort, Support & Productivity
Advanced Ergonomic Design for Long Working Hours 🧠
The High Back Ergonomic Office Chair is designed to provide full-body support for professionals who spend extended hours at their desks. Its ergonomic structure promotes proper posture, reduces strain on the spine, neck, and shoulders, and enhances overall comfort throughout the workday.
High Backrest with Lumbar & Upper Back Support 💺
Featuring a tall, contoured backrest, this chair supports the natural curve of your spine from the lower back up to the shoulders. Integrated lumbar support helps maintain healthy spinal alignment and minimizes fatigue during prolonged sitting.
Breathable & Comfortable Upholstery 🌬️
Upholstered with breathable mesh or premium fabric/leatherette (model dependent), the chair allows proper air circulation to keep you cool. The high-density foam seat cushion provides long-lasting comfort without sagging.
Fully Adjustable for Personalized Comfort 🔧
This ergonomic chair includes pneumatic height adjustment, a tilt and recline mechanism with tension control, and adjustable armrests (model dependent). These features allow you to customize the chair to your preferred seating position for maximum comfort and productivity.
Strong Base with Smooth Mobility 🛠️
Built with a heavy-duty base and smooth-rolling caster wheels, the chair ensures stability and effortless movement across different floor surfaces. The 360° swivel function adds flexibility and convenience in dynamic work environments.
⭐ Key Features with Subheadings
High Back Ergonomic Design 🧠
Provides full back and shoulder support for healthy posture.
Integrated Lumbar Support 💺
Reduces lower back strain during long sitting hours.
Breathable Upholstery 🌬️
Mesh or premium fabric/leatherette keeps you cool and comfortable.
High-Density Seat Cushion 🛋️
Offers long-lasting comfort and pressure relief.
Height Adjustable Mechanism 🔧
Pneumatic lift for easy seat height customization.
Tilt & Recline Function 🔄
Allows relaxed seating with adjustable tension control.
Adjustable Armrests 💪
Customizable arm support to reduce shoulder fatigue.
Heavy-Duty Base & Casters 🛠️
Ensures stability and smooth movement.
360° Swivel Rotation 🔁
Enhances mobility and workspace accessibility.
Professional Office Aesthetic ✨
Modern design ideal for executive offices and home workspaces.
The High Back Ergonomic Office Chair combines advanced support, adjustability, and durable construction, making it an excellent seating solution for corporate offices, home workstations, and executive environments. Stay comfortable, supported, and productive every day 📈.
You may also like…
-
Office Cabinets
2-Door Cabinet with Safe
KSh32,500.00Original price was: KSh32,500.00.KSh28,500.00Current price is: KSh28,500.00.Add to cartSecure Storage Meets Smart Organization
The 2-Door Cabinet with Safe is the perfect blend of everyday office storage and enhanced security. Designed for professionals who need to store both general supplies and sensitive documents, this steel cabinet features a spacious dual-door compartment with adjustable shelving—and an integrated internal safe for confidential items, keys, or cash.
Its robust construction, modern finish, and lockable mechanisms make it ideal for offices, schools, clinics, or home workspaces that require both functionality and protection.
Key Features:
-
✅ Integrated Built-In Safe
Securely stores valuables, cash, sensitive files, or devices. -
✅ Lockable Double Doors
Ensures restricted access to main storage contents. -
✅ Adjustable Interior Shelves
Customize the cabinet space for files, boxes, or office supplies. -
✅ Durable Steel Construction
Provides long-lasting strength and resistance to wear. -
✅ Compact, Space-Efficient Design
Fits neatly into corners, beside desks, or in storage rooms. -
✅ Powder-Coated Finish
Resists scratches and adds a sleek, professional look.
Ideal For:
-
Offices and administrative departments
-
Clinics, banks, and financial institutions
-
School or university records storage
-
Home offices needing secure organization
Tags: 2-Door Cabinet with Safe, Office Storage Cabinet with Safe, Lockable Steel Cabinet, Secure Filing Cabinet, Safe Cabinet for Office, Cabinet with Lockable Safe Compartment
-
-
Office Tables
1.2 Meters Executive Office Desk
KSh28,500.00Original price was: KSh28,500.00.KSh20,500.00Current price is: KSh20,500.00.Add to cartCompact Power with a Professional Edge
Perfect for modern offices or home workspaces, the 1.2 Meters Executive Office Desk offers a streamlined design without compromising on functionality. Measuring 1200mm in length, it delivers just the right amount of workspace for laptops, documents, and office essentials—ideal for executives, managers, or remote professionals working in smaller spaces.
Crafted from high-quality materials and available in a range of finishes, this desk adds a polished, professional look while helping you stay organized and productive. Optional features like lockable drawers, modesty panels, and cable ports enhance convenience and style.
✅ Key Features at a Glance
-
1200mm Desktop Surface: Perfectly sized for efficient work in compact spaces.
-
Professional Look: Available in wood grain, matte black, walnut, oak, or grey finishes.
-
Durable Construction: Made from high-grade MDF or engineered wood with a scratch-resistant surface.
-
Optional Storage: Can include side drawer units or mobile pedestals for added organization.
-
Ergonomic Height: Designed for optimal comfort and posture support.
-
Modesty Panel (optional): Adds privacy and visual structure to the desk.
-
Cable Management (optional): Keeps wires tidy for a clean, uncluttered workspace.
-
Easy to Assemble: Comes with clear instructions and all necessary hardware.
Perfect for: Executive offices, compact corporate spaces, home workstations, student desks, and private offices.
-
-
Office Tables
1.2 Meters Executive Office Desk
KSh28,500.00Original price was: KSh28,500.00.KSh20,500.00Current price is: KSh20,500.00.Add to cartCompact Elegance for Productive Workspaces
Upgrade your office with the sleek and practical 1.2 Meters Executive Office Desk, designed for professionals who need a stylish yet space-efficient workstation. This desk offers a clean, modern look with a smooth surface perfect for laptops, monitors, and daily office essentials. Its compact size fits comfortably in smaller offices or home workspaces without compromising on functionality.
Crafted from premium materials with a durable finish, this executive desk combines sophistication and practicality to help you stay organized and productive throughout your workday.
✅ Key Features at a Glance
-
1.2 Meters Wide Work Surface: Ideal size for focused tasks and essential office equipment.
-
Durable Construction: High-quality wood or laminate top with sturdy metal or wooden legs.
-
Modern Executive Design: Clean lines and professional finish complement any office décor.
-
Optional Cable Management: Keeps cords and cables tidy and out of sight.
-
Compatible with Storage Units: Easily pairs with drawer pedestals or filing cabinets.
-
Scratch-Resistant Surface: Maintains a polished look over time.
-
Easy Assembly: Comes with clear instructions and all necessary hardware.
-
Compact Footprint: Perfect for smaller office spaces and home offices.
Perfect for: Executives, managers, freelancers, and professionals seeking a neat, functional workspace.
-
-
Office Cabinets
2-Door Metallic Office Cabinet
KSh28,500.00Original price was: KSh28,500.00.KSh23,500.00Current price is: KSh23,500.00.Add to cartSecure, Durable, and Space-Saving Storage
Keep your workspace organized and your important documents secure with the 2-Door Metallic Office Cabinet. Built from high-quality steel with a powder-coated finish, this cabinet is designed for heavy-duty office use while offering a sleek, professional look that suits any business environment.
With lockable double doors and adjustable shelves, it provides flexible storage for files, supplies, and personal items. Ideal for offices, schools, hospitals, or warehouses, this cabinet helps maintain a clutter-free, efficient workspace.
✅ Key Features at a Glance
-
Durable Metal Construction: Made from high-grade steel for long-lasting use.
-
Lockable Double Doors: Central locking system with key for secure storage.
-
Adjustable Shelves: Easily customize interior space for files, binders, or equipment.
-
Powder-Coated Finish: Scratch-resistant surface available in neutral tones like grey, black, or beige.
-
Ventilation Slots (optional): Help reduce moisture and keep contents fresh.
-
Compact Footprint: Efficient vertical storage for small or large office spaces.
-
Weight Capacity: Shelves designed to hold heavy documents and office supplies.
-
Low Maintenance: Easy-to-clean surface ideal for busy work environments.
-
Flat-Pack Assembly: Ships ready to assemble with clear instructions and hardware included.
Perfect for: Corporate offices, educational institutions, medical facilities, government departments, and industrial storage rooms.
-
Related products
-
Office Tables
1.6 Modern Executive Office Table
KSh75,000.00Original price was: KSh75,000.00.KSh65,000.00Current price is: KSh65,000.00.Add to cartSleek Design with Executive Functionality
Upgrade your workspace with the 1.6 Meter Modern Executive Office Table, a premium solution that blends minimalist aesthetics with executive-grade functionality. Designed for professionals who value both style and efficiency, this desk provides ample space for laptops, files, and multitasking, while enhancing the overall look of your office with its clean, modern finish.
Crafted from durable MDF or engineered wood and finished with a scratch-resistant surface, it’s perfect for executive offices, private workspaces, or upscale home offices.
✅ Key Features
-
Spacious 1600mm Tabletop
Offers plenty of room for computers, documents, and personal items without clutter. -
Modern Executive Design
Sleek lines and neutral tones elevate any professional workspace. -
Durable Construction
Made from quality engineered wood with a laminate finish that resists scratches and stains. -
Integrated Storage Options
Choose versions with built-in drawers, side return cabinets, or cable management systems. -
Sturdy Metal or Panel Legs
Provides strong support and long-lasting durability. -
Easy Assembly
Includes clear instructions and all necessary hardware. -
Optional Add-Ons
Compatible with matching credenzas, pedestals, and ergonomic chairs.
📌 Ideal For:
-
Executive and managerial offices
-
Home offices requiring a stylish upgrade
-
Corporate workspaces and professional studios
-
Creative or administrative environments
Make a statement with smart design and executive presence—the 1.6M Modern Executive Office Table is built to impress and perform.
-
-
Boardroom Tables
3-Meters Office Boardroom Table
KSh115,000.00Original price was: KSh115,000.00.KSh98,500.00Current price is: KSh98,500.00.Add to cartImpressive Scale for Powerful Meetings
Create a commanding presence in your conference room with the 3-Meters Office Boardroom Table, engineered for executive-level collaboration and high-profile meetings. With a generous 3000mm (3-meter) length, this table comfortably seats 10 to 12 people, offering ample space for discussions, presentations, and strategic planning.
Crafted from durable engineered wood with premium laminate, veneer, or melamine finishes, this boardroom table blends modern design with professional functionality—making it an essential centerpiece for any boardroom or executive meeting space.
✅ Key Features
-
Spacious 3-Meter Design
Accommodates 10–12 chairs, ideal for boardrooms, leadership meetings, and collaborative work. -
Premium Surface Finish
Available in rich wood tones like walnut, oak, mahogany, or contemporary matte options. -
Robust Construction
Built from heavy-duty engineered wood or MDF for strength and long-lasting use. -
Optional Cable Management
Includes grommets or power/data ports to support conference tech and keep cables tidy. -
Elegant Tabletop Edges
Rounded or chamfered edges offer a clean, executive aesthetic. -
Stable Base Design
Panel or column legs provide maximum support with ample legroom. -
Scratch & Stain-Resistant Surface
Low-maintenance and durable for frequent use in professional settings.
📌 Ideal For:
-
Corporate boardrooms and executive conference spaces
-
Team strategy sessions and leadership meetings
-
Client presentation areas
-
Professional spaces seeking a statement piece with functionality
Transform your conference room into a hub of professionalism and productivity with the 3-Meters Office Boardroom Table — where leadership meets design.
-
-
Office Tables
1800mm Executive Office Desk
KSh58,500.00Original price was: KSh58,500.00.KSh48,500.00Current price is: KSh48,500.00.Add to cartSleek Design for Maximum Productivity
Command attention and enhance productivity with the 1800mm Executive Office Desk, crafted for professionals who value both style and substance. With a generous 1.8-meter surface, this desk provides ample space for laptops, documents, and desktop accessories, making it ideal for executives, managers, or remote professionals.
Built from premium materials and finished with a sleek, modern design, this desk brings a polished, professional look to any office. Optional features such as integrated cable ports and add-on storage modules ensure a clutter-free, functional workspace tailored to your daily needs.
✅ Key Features at a Glance
-
Spacious 1800mm Work Surface: Offers plenty of room for dual monitors, files, and more.
-
Premium Construction: Built from engineered wood or MDF with a durable, scratch-resistant finish.
-
Modern Executive Design: Clean lines and contemporary aesthetics elevate any office environment.
-
Integrated Cable Management: Keeps wires organized and your desk surface tidy.
-
Sturdy Base: Panel or metal legs ensure excellent stability and long-term use.
-
Optional Storage Add-ons: Compatible with drawer pedestals, hutches, and side returns.
-
Finish Options: Available in walnut, oak, espresso, white, black, or custom corporate tones.
-
Easy Assembly: Ships flat-packed with clear instructions and assembly hardware.
Perfect for: Executive offices, home offices, management suites, or any professional setting that demands a high-performance workspace.
-
-
Office Tables
1.8 Meters Executive Office Desk
KSh68,500.00Original price was: KSh68,500.00.KSh58,500.00Current price is: KSh58,500.00.Add to cartSophisticated Space for Powerful Performance
Command attention and lead with confidence from behind the 1.8 Meters Executive Office Desk, designed to bring structure, style, and spacious efficiency to your professional environment. With its generous surface area and refined design, this executive desk supports multitasking while adding a polished, authoritative presence to any office.
Built from premium materials with a durable finish, the desk offers functional features such as cable management, optional side returns, and integrated storage. Whether for a CEO, manager, or remote executive, this desk combines elegance with productivity.
✅ Key Features at a Glance
-
Spacious 1800mm Desktop: Offers ample room for dual monitors, files, and office accessories.
-
Premium Surface Finish: Available in high-end wood veneers, melamine, or laminate (walnut, oak, mahogany, grey).
-
Durable Build: Constructed from high-grade MDF or engineered wood for strength and longevity.
-
Optional Storage Add-ons: Includes matching drawer units, return cabinets, or modesty panels.
-
Integrated Cable Ports: Keeps your workspace organized and wire-free.
-
Sleek & Professional Design: Clean lines and solid construction for a modern executive look.
-
Ergonomic Height: Optimized for comfort during long working hours.
-
Easy Assembly: Flat-packed with clear instructions and all required hardware.
Perfect for: Executive offices, boardrooms, home offices, and professional workspaces that demand both form and function.
-




















Reviews
There are no reviews yet.